08-Reactor vessel be#17260E

The reactor waited in wind and snow for three days before it was taken into the containment sphere. On February 8 it was moved inside on skids over logs, and on the 9th tilted vertical to be hoisted high over the center of the sphere, moved by a gantry crane on rails along the top of the concrete monolith, centered with pinpoint accuracy, . . .